Scenario: We goods issue stock onto Plant Maintenance Orders using a 261 Movement Type. For whatever reason in the business this material is no longer needed and they perform a 262 movement using MIGO to reverse/cancel the original 261. They would like to create an inspection lot and inspect the goods before they go back into stock.
Problem: When I perform a MIGO either using
A03 (Cancellation) and R02 (Material Document)
or
A07 (Goods Issue), R08 (Order) and a movement type 262.
I cannot get an inspection lot to be created. I can post the documents without trouble and can see a long list of 262 movement types in MB51 of all of my failed attempts.
Steps taken so far:
I have searched these forums for an answer but cannot find anything. I thought it was now appropriate to ask the question. I am at a dead end as to what to try next. If anyone could offer any guidance it would be greatly appreciated. Incase it is required we are using SAP S/4 HANA 1909. Transactions like MBST are no longer available and it all needs to be done through MIGO as per SAP note 2210569