Connection production version and change master combined with object managment record

kf3
Member
0 Kudos

Hi,

we would like to work with object management records for routing and BOM in S/4 HANA.

However, the change master is currently not included in the production version. Subsequently, the date element that was maintained in the Change Master (CC02) does not apply.

Can someone say why the Change Master is not automatically included in the production version? If the change number is entered manually, the entry will be deleted after saving.

How can a connection be established between the change master and the production version?


Many thanks in advance!

Best regards,
k.f.

Accepted Solutions (0)

Answers (0)