cancel
Showing results for 
Search instead for 
Did you mean: 

Success Factors integration center capability

0 Kudos

We used Success Factors integration center to export a CSV file into an SFTP folder on a daily basis.

We need to increase the frequency of how often this job runs. Are there any system constraints to how often this data can be exported?

How often can I schedule this job to run without putting a burden on the system and slowing things down.

Accepted Solutions (1)

Accepted Solutions (1)

nageshpolu
Contributor
0 Kudos

You can schedule a maximum of 5 integrations with a frequency of minimum 3 times per day up to a maximum of 12 times per day. You will see an error occurring if you have reached a maximum limit of 5 integrations with this scheduling type.

Customers that need more than 50 scheduled Jobs in integration center should open an incident in the LOD-SF-INT-INC component with below detail:

  1. What are the total number of employees ?
  2. What is the expected increase in the number of daily jobs ?
  3. Is there a possibility that they schedule the current daily jobs for a longer frequency ( Ex: Weekly) ?
  4. How many of these integrations are extracting full data and how many of these will extract delta records ?
  5. Give examples of their existing / new use cases of daily runs.
  6. What is the approximate number of records being extracted per scheduled execution of the integration ?
  7. Example of the API's / Entities being used to in case of extracting full data
  8. Please explain shortly what are the business requirements for this increase.
  9. Please share your SF Company ID where you need this.
  10. Estimated duration of the jobs.

This parameter can only be changed by SAP support team -- under Company Settings in the backend system. I hope this helps.

Answers (0)