Re-baseline forecasts

106 Views Last edit Mar 12, 2021 at 03:51 PM 3 rev

I have numerous projects schedules that have undergone contractual changes.

These projects have incurred costs during the project and naturally there is variance between the original baseline and the actuals/forecast to complete.

Is it possible to re-baseline a plan such that the actuals contained within the project align with the new baseline as per below table without re-planning the data in the past to have a planned cost that matches the actual cost?