on 03-16-2021 2:24 PM
Hi Everyone,
Business requirement:
1 Plant and 2 SLoc within it (SL-1 & SL-2)
If we have 100 PC available in SL-1
When STO PO is created for 80 PC where Issuing SLoc is SL-1, available Qty in co09 should then be 20 PC
What are the configuration steps for this in OVZ9?
Hi,
What is the availability check assigned to material master ? does at the moment the availabilty check is giving the right quanttity
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.