Skip to Content
0
Mar 03, 2021 at 08:36 AM

Problem in the inspection lot creation for a specific material

37 Views

Hello,

we have a problem in the automatic assignment of reference operation set to an inspection lot created for a material.

As you see in the screenshoots we have created a class:"PROVISION_MAT" that has the characteristic:"MAT_COD" linked to MARA-MATNR field, but when we create an inspection lot for this material the system doesn't match correctly the reference operation set.

Can anyone help us to clarify the problem, please?

Thank you.

Attachments

ros-header.png (23.4 kB)
inspection-lot.png (34.3 kB)