on 02-24-2021 2:51 PM
Hi all,
we are using HANA Live connection based on calculation view. After change (new calculated column) on CV, we get the new column in SAC Model but it's not available in already existing Story. If we create new story, we also can use the new column. Is there any way to get the new column which also is available in SAC Model in already existing Story?
The yellow marked is the new measure and available in model.
In already existing story the new measure is missing.
Test with new story, measure is available.
Many thanks and Regards,
Marco
Hello Debjit,
many thanks so far. Yes, hope this can be solved next time.
Kind Regards,
Marco
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Debjit,
thanks for proposal but it is not way which I can use. If I reconnect the Model, I have to rebuild tables, charts and linked results. In this case I have to change all the linked model but this will cause a lot of effort. If I change for one table for example, the new column is still missing.
The main problem is, if we enhance any calculation view in HANA, we always have to rebuild all Stories where the Model based on change CV is used.
Do you have any other idea?
Thanks and regards,
Marco
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
10 | |
9 | |
9 | |
9 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.