Skip to Content
0

Change Time on the Report while scheduling the distribution of the Report

Feb 16, 2017 at 10:09 PM

32

avatar image

Hello

I have scheduled the distribution of the BPC Report, which works great. But It only pulls data for Time dimension member which was selected when I saved the distribution template.

For e.g. When I saved the distribution template, Default time member was 1st February 2017. Is there a way to dynamically change this time variable? Does this information is saved in SQL?

Thanks in advance

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers