Hi Gurus

I have a requirement for a different Plant to be entered manually in a Return Order with reference. The Return order copies the information from the preceding Billing document, then the Plant is manually changed in the Return order.

However, after the manual change, the Route and Storage Location are not automatically redetermined based on the new Plant. How can I trigger automatic determination of the route, storage location etc after a manual change in the order?

Regards