Configure Inspection Type 03 for Process Order linked to an inspection plan

192 Views

Hi,

I currently have a process where I want to enable quality control during the production process (03) together with inspection points. However, I do not want the inspection lot to use master recipe operations as its source, but rather an inspection plan.

How can I do this using type of inspection 03 or else, some other type of inspection that is created in the release of the order together with type 04 that I currently use.

Thanks in advance for your help.