on 11-21-2020 3:38 AM
Hi Experts,
I have a small issue, the business procures the Material in KG and samples are to be calculated in PC. So Accordingly I have maintained the AUoM in Material Master in PC as the base UoM is KG.
4 PC = 1 KG
As the samples vary according to the Lot size, so I have maintained the Sampling scheme. The sampling scheme data is as Follows only
Lot Size SampleSize
1 1
10 2
500 5
1000 10
1000000 20
Now, if i manually create an inspection Lot for the Material for verifying the sample calculation i am facing the below issue.
1. if the Lot size is 50 kg, the system takes 5 samples , so the total sample size would be in A ( 5/4) kg which is correct, but if i enter the lot size as 9, then also the system takes the sample size as ( 5/4 ) which is wrong.
Can anyone help me with this ASAP.
Thanks and Regards,
Abhishek Parab.
Hi Abhishek,
As per your description, it seems that the system is considering the AUoM ( it might be maintained in tje insp plan header and mics)
So, 50 kg is 200 pcs and 9kg is 36 pcs
In both cases, it will pick 5 samples as per your plan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.