Nov 20, 2020 at 03:19 PM

Production "Supply" Key Figure

49 Views

Hi Experts

As with transportation we have a Transport Supply at the Dispatching location that is generated based on the transport receipts and lead time to the supplying location. For Production we have the production receipts key figure in the period which the output is required. Is there a standard key figure stating the period within the production needs to start for the given receipts based on the production lead time?

Regards

Ebrahim