Skip to Content
0
Oct 28, 2020 at 12:04 PM

cannot schedule migrated jobs in new Data Services system

102 Views

Hi there,

I have migrated a repository from an older 4.2 install to a new one (latest SP).

I took a backup of the old repo database (SQL Server) and restored it to a new location with a new name.

I have used the repo manager to upgrade the repo.

I have connected a job server to the repo

I have registered the repo in the new IPS CMC and it tests fine

I have configured the CMS in the DWS CMC/Management area and it tests fine

I have removed references to the old system from the al_machine_info table in the repo database.

However when I try to schedule a job I get the error 'CMS connection is not valid'. This job is one of the ones that was in the repo from before the migration. What am I missing that needs to be updated? Does the job still pine for the old CMS?

thanks in advance

Keith