Hi SAP GURU,
Measuring point is created with reference to Equipment.
For this link, is there a way to break it that we can replace the equipment with a dummy one?
In case the counter is wrong or duplicated, in equipment master, only the correct counter can be displayed.
Thank you so much,
Sally