I'm having requirement of changing the operation time of the dispatched operation in CM25.

I have done operation split to a person in CM25 and done the dispatch the operation.

I need to change that dispatched operation from the future time of that same day by using drag and drop functionality. If we double click on the dispatched operation, i'm able to change the time manually.

But the customer is requesting that, this functionality needs to run using drag and drop.

In drag and drop config, source and target chart maintained 1 with AV09.

Please suggest if anything needs to be done to meet the customer requirement to change the time of operation using drag & drop.