Skip to Content
0
Sep 17, 2020 at 01:10 AM

Link PLM spec to MIC

75 Views

Experts,

I have an inspection plan for a Material. I have a single MIC in this plan. I would like to have the target value for the MIC populate from one of the VAT in the specification for the Material. I am aware that we can maintain the target value in QP01. Is it possible to link a MIC with VAT value from a Material spec?

BR,

Aspire