Skip to Content

SAP BPC 10 NW VS SAP BPC 11 BW on HANA /BW4HANA

Hi Team,

Coulfd you pls throw some light on BPC 10 upgrade to BPC 11 Standard BW on HANA/BW4HANA .

Is there any change in BPC 11 Standard in terms of EPM, Business Rules, Script Logic, Input sheet, BPF, Work status Etc what we had in BPC 10 NW.

Thanks,

Rahul

+966543592380

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Sep 04 at 11:11 AM

    Nothing different, the only missing thing compared with BPC 10 is zero elimination with lite optimization.

    https://blogs.sap.com/2019/10/23/how-to-optimize-bpc-model-in-sap-bpc-11-version-for-sap-bw4hana/comment-page-1/#comment-526712

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.