Hi everyone,
We have set dynamic modification rule at material master level since we want to see the impact of DMR (set at material master level) on the quality level of that material. In the inspection plan for that material, at the header level we have kept the DMR fields as blank meaning that DMR is only assigned at the material master level.
However, when the inspection lot is created, the inspection specifications tab of the inspection lot is unable to comprehend the DMR which was assigned at the material level & hence it doesnt change/update the quality level.
Can someone please advise if they have come across this scenario or can someone suggest any steps in order to ensure that quality level is updated even if DMR is assigned only at the material master level?
Thanks