Executing rework process in manufacturing with operation set

Hello,

could you please support me in the following case:

Let say i have 3 operations

0010, 0020,0030.. In the operation one I confirm 80pcs yield and 20 pcs rework. In this case with partially confirmation the trigger point gets activitated with an operation set of one rework operation with op. number 0011.

now when i release operation number 0011 and I click on actual data, it displays only the 80 pcs. Let say that i rework that quantity (it is now yield) and confirm the 80 pcs. So my question is, whould i confirm something again in the previous operation? and in the proceeding operation 0020, by confirmation, i only get 80 pcs displayed after clicking on actual data.. so what is the best procedure here for operation set!

I had a look on different blogs, but dont find this specific question. I will appreciate if you could support me in this specific question.

thank you!!

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.