08-20-2020 12:26 PM
Hello experts,
How can I change the posting date in the material document when PGR has been posted.
I've checked MB_MIGO_BADI. There is a structure in the badi is_gohead-budat. But it was an import parameter. I'm not able to edit the value. Any other suggestions? Or I'm using a wrong badi.
Thanks