SAP QDR <-> LIMS vs MII <-> LIMS

Hello MII Folks,

Recently I came to know that SAP can integrate with LIMS (laboratory information management system) using QDR (standard configuration in SAP) . This will enable RFC's to send data directly to LIMS system. In this scenario do we really need an integration layer such as MII between SAP and LIMS system? I would like to know what are the advantages when we integrate SAP with LIMS using MII (SAP <-> MII <-> LIMS) over QDR. I am looking for the pros and cons.

Any help on this very much appreciated

Thanks

Shaji

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Aug 04, 2020 at 08:11 PM

    Hi Shaji,

    The need for SAP MII with LIMS is most likely determined by whether there is data coming from the shop floor that needs to be processed in LIMS. And if so, the RFCs can be used by MII to transport the data that it can get from SCADA, PCo, etc. If LIMS only needs data from ECC (which I would not expect, but possible), then one would not need MII.

    Regards, Mike

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.