on 08-03-2020 5:45 PM
Hello Everyone,
I have a situation where I need to do Repair full load for 0HR_PT_2 beyond Time frame for Transfer (1 year) defined in Tcode SBIW in source system. The Time frame for transfer is dynamic which changes every month by itself.When I run the Repair Full load beyond that, it is not picking data. So, how can I do that? Any leads will be appreciated. Thanks in advance.
User | Count |
---|---|
83 | |
10 | |
10 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.