Skip to Content

0HR_PT_2 REPAIR FULL LOAD

Hello Everyone,

I have a situation where I need to do Repair full load for 0HR_PT_2 beyond Time frame for Transfer (1 year) defined in Tcode SBIW in source system. The Time frame for transfer is dynamic which changes every month by itself.When I run the Repair Full load beyond that, it is not picking data. So, how can I do that? Any leads will be appreciated. Thanks in advance.

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.