Hello,
In the S/4 HANA upgrade guides,it is said to perform SI checks & Custom code migration too. These steps are done in S/4 HANA conversion.
Why is SI check or Custom Code migration required in S/4 HANA upgrade? We don't do them in ECC upgrades.
In what phase does SUM actually perform the SI checks ?