Skip to Content

Replicate BPs from Solman PROD to Solman DEV.

Hi Guys.

I haven't found any documentation that talks about replicating BPs between SOLMANs.

I will do some configs on BRF+ and it will be very helpfull to have the same BPs between systems.

Is there a documentation on how to do this replication? I have read it is possible to do it with by using ALE but for the replication triggering talks about using MDG business functions. and not sure is SAP recommend to activates this BF in Solman.

please guide us how we can proceed.

Regards

Henry

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Aug 03, 2020 at 03:13 PM

    Hallo Henry,

    please check your requirements with this proposal - the keyword is HRALXSYNC:

    Best regards

    Thomas

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.