Skip to Content
0
Aug 01, 2020 at 10:16 AM

Costing run issue with CK40N

252 Views

Dear Consultant,

Yesterday I ran costing run in CK40N. After costing run below steps was run:-

a. WIP Calculation (KKAO)

b. Calculate variance (KKS1)

c. Actual settlement (CO88)

When I checked the costing run, I found that 4 materials were not run the costing due to the user was doing something with the materials at the same time when costing was scheduled to be run. Refer the screenshot below.

Kindly suggest me what to do with the above 4 materials which were not run in the costing. Should I run costing for the above 4 materials individually?

Thanks in advance

Regards,

Shreekumar