cancel
Showing results for 
Search instead for 
Did you mean: 

Restriction for cost estimate

former_member682651
Participant
0 Kudos

Hi

I have a case where there is no BOM and a cost estimate is allowed to be saved. The pricing is updating as routing was maintained. The message CK 424 " No BOM found" is set up as I only.

I tried to change the same in OBA5 and OBMSG but no help. I need that cost estimate should be restricted if no BOM is maintained

Accepted Solutions (1)

Accepted Solutions (1)

sanilbhandari
Product and Topic Expert
Product and Topic Expert

Hello abhiksur2020

You can change the message from I to E or A in the below path:

IMG> Controlling>Product Cost Controlling>Product Cost Planning>Basic Setting for Material Costing>Error Management>Define User Defined Message Types

Click on message 424 and change the status to E or A under a TR

Thanks & Regards,

Sanil Bhandari

former_member682651
Participant
0 Kudos

Thanks a lot sanil.bhandari for your quick help

Answers (0)