Restriction for cost estimate

Hi

I have a case where there is no BOM and a cost estimate is allowed to be saved. The pricing is updating as routing was maintained. The message CK 424 " No BOM found" is set up as I only.

I tried to change the same in OBA5 and OBMSG but no help. I need that cost estimate should be restricted if no BOM is maintained

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jul 27, 2020 at 06:04 AM

    Hello Abhik Suryavanshi

    You can change the message from I to E or A in the below path:

    IMG> Controlling>Product Cost Controlling>Product Cost Planning>Basic Setting for Material Costing>Error Management>Define User Defined Message Types

    Click on message 424 and change the status to E or A under a TR

    Thanks & Regards,

    Sanil Bhandari

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.