Dear Experts,

I tried to find a similar question but haven't been lucky.

If I use POSC for an inbound process, where POSC steps are Unload -> Deconsolidation by Consolidation Group -> Putaway with LOSC to High Rack.

I have difficulties to generate and stop at LOSC storage when multiple line items exist in the HU belong to the same Consolidation Group/Storage Type. There is no issue with Single Line Item HU.

At the final Storage Type, Mixed HU, and HU itself allowed, also at the intermediate Storage.

POSC:

LOSC:

I find out if ID nor Pick Point is checked, the LOSC can be used as Intermediate stop. It worked with a different WH as well.

If I create /SCWM/ADHU HU task also works. The issue is when Closing the HU after Deconsolidation the system not creating a HU task, but only a HU Warehouse Order, therefore, will not execute Routing with LOSC.

Has anybody faced an issue like this before?

Any help or suggestion would be highly appreciated.

posc.png (25.9 kB)
losc.png (4.0 kB)
prod-wt.png (22.3 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.