Reverse Resource issued in Production Order SAP B1 9.2 PL10

In a Production Order, Resource's issue method has been set to Backflush, then partially taken receipt from production.

Resources has been issued automatically.

But the Resource's Base Qty was wrong.

1. Need to reverse the Resources issued

or

2. Adjust the value of resources like (stock revaluation or Manual journal entry)

or

3. Some other ways to solve it

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.