Skip to Content
-1

PP Implementation in Textile Industry

Hi Experts
I need your guidance in the implementation process of textile industry for PP module (production process and planning both)
I have gone through many links on the SCN forum and understood that, in implementation process, VC (variant configuration) will be required.

Please make me suggest that need I do the all implementation in ECC or SCM/APO will also be required?

It will be very helpful if anyone can send me a Business process document along with transaction code.

Thank you!

Best Regards

Amit Sharma

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.