Dear Experts,

I have a requirement as below:
I have a SFG material which is externally procured(from China) in plant A and in-house manufactured in plant B(made in USA). There are few clients who send order in Plant A and ask for the USA made SFG part to be used in FG assembly for better quality (STO process). Else by default it is procured from China. How do I replicate this scenario in MRP?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jul 28, 2020 at 05:48 AM

    If you are using, S/4HANA, you can achieve this by using segmentation functionality. Segmentation will be useful if you do not want to create multiple materials for the same FG based on whether the SFG is made out of US or not.

    Other option is to create separate FG materials based on whether the SFG is made in China or USA.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.