Skip to Content

PI migration to new system with same host name but with different IP

Hi Experts,

Our PI system is migrated to new PI system with same host name but with different IP.

All the objects from lower PI system got migrated to higher PI system automatically.

Should we need to check the connectivity from SAP ECC to SAP PI?

What all things do we need to check as part of connectivity & ensure that everything will work as expected.

Thanks,

Ramu.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jul 20, 2020 at 03:02 PM

    Hello Ramu,

    1) on the Source system, ensure there are no open Change Lists; ensure there are no errors in Cache Status Overview in ESR and Directory

    2) system health checks as per note 817920 XI/PI/AEX Readiness Check 3.0/7.0, 7.1, 7.3, 7.31, 7.4, 7.5, should be executed prior to any such migration and post completion on target system

    3) if this migration involved a System Copy, ensure official SAP Guide is followed - especially post-copy steps on target system. See note 2574603 PI: Official SAP Guide Finder, to access official SAP Guides.

    Regards
    Mark

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.