Skip to Content
0
Jul 15, 2020 at 09:06 AM

PPDS heuristic SAP_PP_007 maximum stock level

124 Views

Hi all


When using heuristic SAP_PP_007 with reorder point and maximum stock level, the system creates proposals for the current date, and not if the proyected stock falls below reorder point in the future.

We want to produce to max stock every time proyected stock is below reorder point or safety stock.

What should be the heuristic?