Dear Experts,

I am doing mandatory configurations for solman 7.2 and i am in step infrastructure preparation and here i can see step setup SAP BW as shown in below screen.

But i am not able to understand why this step is required and is it a mandatory step taht needs to be done. ANd what would be the benifit of doing this step.

Please help on this.

capture.png (30.9 kB)
Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    Posted on Jul 14, 2020 at 12:22 PM

    Hi Prashant,

    Yes it is mandatory step to configure the BW config.

    In solution manager there is many feature which need BW config like ChaRM Analytics ,CCLM dashboard so to work with any of reporting function BW config is needed.

    check below link for more information

    https://blogs.sap.com/2014/09/21/reporting-on-solman-bw/

    BR

    Atul

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 17, 2020 at 07:42 AM

    Hello Prashant Nagar,

    see the first Guidance Document - SAP First Guidance – SEM/BW Modelling in SolMan 7.x with MOPz/MP. there are additional settings on the BW system to do.

    Best Regards Roland

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.