Skip to Content

Unlink lot size from requirement associated with reservations

Hi

In V1 materials, how can set up a material in order to unlink the "Lot size" from the requirements associated with system reservations?

Thanks!

Add a comment
10|10000 characters needed characters exceeded

  • Hi, Javier:

    Thank you for visiting SAP Community to get answers to your questions. Since you're asking a question here for the first time, I recommend that you familiarize yourself with https://community.sap.com/resources/questions-and-answers (if you haven't already), as it provides tips for preparing questions that draw responses from our members. For example, you can outline what steps you took to find answers (and why they weren't helpful) and share screenshots of what you've seen/done.

    Should you wish, you can revise your question by selecting Actions, then Edit (although once someone answers your question, you'll lose the ability to edit the question -- but if that happens, you can leave more details in a comment).

    Finally, if you're hoping to connect with readers, please consider adding a picture to your profile. Here's how you do it: https://www.youtube.com/watch?v=F5JdUbyjfMA&list=PLpQebylHrdh5s3gwy-h6RtymfDpoz3vDS. By personalizing your profile with a photo of you, you encourage readers to respond.

    Kind regards,

    --Jerry

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.