Skip to Content

Can we complete the PM order technically based on specific user status in sap

Hi Experts,

Can we complete the PM order technically based on specific operation user status in sap through config, if yes what will be the steps. if not what are the alternative options-

Requirement is

when work order operation status is set as (FCOM) field complete order should complete technically(TECO)

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 08, 2020 at 11:44 AM

    Animesh Patra,

    You cannot do this via configuration, instead you will need to develop a solution.

    PeteA

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.