How to change valid from date and valid to date through ECN

0 Kudos

Hi,

I want to change the Valid from date and valid to date in BOM. Pls refer below my case and kindly suggest how can i do this.

I have currently third item in BOM with some past date and end date is 31.12.9999 and other two items to be included in BOM with Valid from date to be 07.07.2020 and Valid to date to be 31.08.2020 and third item Valid from date to be 01.09.2020 and Valid to date to be 31.12.9999

B131012R152.101M00

B131012R152.008M00

B131012R152.101M01

Thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

rupesh_brahmankar3
Active Contributor

Hello,

You can do that with different change number by deleting and adding same compoenent.

Please refer this discussion on same topic

Change "Valid To" date of BOM component

Best Regards,

R.Brahmankar