Jul 01, 2020 at 11:49 AM

CK40N cost estimate locked error

458 Views

Dear Gurus

We are executing the cost estimate run using CCK40N.

We have entered the required data with variant, controlling area and company code besides costing version. We have completed structure explosion with about 4590 materials coated.

When we are trying to complete the costing step a message is appearing 'Locked Cost Estimates, There are >500 cost estimates locked in the company code. Do you want to continue?'

We are trying to figure out the reason for this message since this is our first closing in Production

It would be great if you can guide on the same