Dear All,
I got the scenario to map and need your suggestion on this
This is the process of the Steel Industry, wherein a day 300-400 production order got confirmed. Each production order is having different lengths and thickness which is the variant parameter. There are two operations in the production order. As it is not possible to confirm the order individually through CO11N. Also, the confirmation is based upon the fast entry where each production order silts into the number of pieces.
Kindly suggest how to cnfirm the order havuing the fast enbtry option, where the charcterstics value from sales order to Production ordr get passed, also the spilting of production order into multiple pieces. I have already tries CO1V, but multiple spilting with the characterstics icon is missing.
Regards
Tejas Khanna