Hi guys,
i have an issue in Redwood. I have a requirement wherein:
When Job 1 runs, the Job 2 should run every 30mins until Job 1 run ends.
So basically, while Job 1 is running, it will be the time window of Job 2.
Please advise how I can accomplish this.