Dear all,I want when placing order in ME21N between plants ( internal orders) the plant which ships out the goods to ship out the whole PO and not only the lines they have on stock.How is it possible if I have for example 10 lines with different material numbers open to set them once all of them have DN created then the whole PO to be shipped at once , otherwise not to be possible?Is there such option in ME21N