Hello,
I'm reading through the SAP BW/4HANA Conversion Guide and am having some trouble understanding whether or not the target BW/4HANA setup is a prerequisite to running any of the Scope Identification Checks or the Pre-Checks (pg. 43-46). In other words, is the target system only needed during the realization phase of the migration, or should it also be available during the preparation phase when all the checks and analysis are done? What's causing the confusion is section 3.9 of the document - System Installation and Preparations. Any input would be greatly appreciated.
Thanks,
Dimitar