Hi,
in SAP WM we have storage type with putaway strategy "F" & capactiy check method 1
Then we changed the capacity check method 1 -> 3. In material master of material A we had defined maximum for specific storage bin 2400 pcs. The stock of bin was not empty during change of capacity check method. After the change we remove the stock from bin and did reception with new putaway of 3000 pcs, paletization data are 25 pcs per SUT, stock placement indicator is define that first search for "fixed" storage type and then for another "L - next empty bin" type.
I expected that TO for 3000 pcs will be created - 2400 pcs to place to fixed bin and rest to bin in another storage type (according search type). But actually it did not happened and it allowed me to place whole quantity to fixed bin although it was over maximum definen in WM view 2. Did i expect right result? Could it be because of change of check method ?
Thank you for your help
David Medlík