Setup of material/BOM to consum PIR when combination of finished goods are deliveried

214 Views

Hello all,

We product goods in two configurations, built, we will call sku 6000 (1 finished good) and unbuilt we will call 1000,2000,3000 (3 finished goods)

Is there a was to configure the BOMs, and planning strategies so we can forecast only at the sku=6000 level but consume the PIRs of the material when either the sku=6000 or the combination of 1000,2000,3000 get produced.

The requirement is related the country the item gets sold to and import/tariffs change depending on if a 6000 is shipped, the 1000,2000,3000 are shipped together or the 1000 and 3000 get shipped together and a later shipment can contain the 2000 for final assemble by the customer.

example, We want to be able to forecast that we will sell 10 of the sku=6000 finished goods, but we don't have a way to predict the break down between 6000 vs 1000/2000/3000