Hello all,
We product goods in two configurations, built, we will call sku 6000 (1 finished good) and unbuilt we will call 1000,2000,3000 (3 finished goods)
Is there a was to configure the BOMs, and planning strategies so we can forecast only at the sku=6000 level but consume the PIRs of the material when either the sku=6000 or the combination of 1000,2000,3000 get produced.
The requirement is related the country the item gets sold to and import/tariffs change depending on if a 6000 is shipped, the 1000,2000,3000 are shipped together or the 1000 and 3000 get shipped together and a later shipment can contain the 2000 for final assemble by the customer.
example, We want to be able to forecast that we will sell 10 of the sku=6000 finished goods, but we don't have a way to predict the break down between 6000 vs 1000/2000/3000