I am trying to model build ahead (end item) using the static period of supply seems to be the only option available in Finite Heuristic to model Safety Days like behavior. I have set the Lot Sizing Procedure to 1 in Product Location and updated the SubPeriodsofSupply KF to 2.
Expected Result: demand from the 2 periods in the future to be pulled into the current period.
Actual Result: demand from the subsequent (1) period is pulled into the current period and not 2 periods as expected
(Link to SAP Help on Static Periods of Supply)
Lead Times Modeled: Production Lead Time is 1 week, Transportation Lead Time for components is 1 week
Am I missing any other MD setting?
Any help would be much appreciated.
Thanks,
Krish