Skip to Content
0
Jun 05, 2020 at 11:48 PM

How Do I Backdate a Material Batch to be Unrestricted for Use at a Date Earlier to the Current Date

217 Views

Hello Gurus,

I have a situation where material batch has been configured for restricted initial batch status. When MIGO is posted, material batch is posted as restricted. After sometime - say 1 week - material batch is made unrestricted in MSC2N. But if business requires to use the material for example; creating outbound delivery in a date earlier to the date the material was made unrestricted, system is saying batch quality for material is not available.

Is there a way we can make the system to backdate the day the material batch was made unrestricted? In other words, can we make a material batch that's currently in a restricted status to be unrestricted at a time in the past?

Thanks for your inputs on this.