Skip to Content
0
A S
Jun 09, 2020 at 05:39 AM

Posting only possible in periods 2019/10 and 2019/09 in company code 5410

46 Views

I currently would like to do PGI but faced with the error as shown in title

In mmpv, I couldnt change the current period to June 2020. This is due to current period is October 2019.

In OMSY, I couldnt change either

The following is posting period for mmrv

The posting period is set up originally here:

https://answers.sap.com/storage/temp/1817684-ob52.png

Attachments

omsy.png (40.0 kB)
mmrv.png (12.9 kB)
ob52.png (26.1 kB)