Hi PP Experts,

We have a requirement to create new set-up formula for the setup as follows:

(operation qty/costing lot size) * Set-up time

Note: costing lot size (field LOSGR) from the 'costing view 1' in the same plant as the work center.

I tried adding field LOSGR in transaction OP7B, but I received an error "Entry LOSGR does not exist in TC22", then I added this field in table TC22 via SE16 and but then got error while adding this in formula parameter, "The data object "F" does not have a component call".

Please let me know is there any way with which we can create a new set up formula that works as per the required formula? also please let me know about any development if this is not possible with standard configuration?