Hi Experts,
We are working on SAP PI 7.4 single stack.
Requirement is to connect SAP ECC & PI using IDoc adapter.
To setup the connectivity, what all list things need to be done on backend ECC system.
After I get the list of things to be done on backend, who needs to do what should be known.
Please guide me what all needs to be done by ABAP/Basis/Functional team accordingly.
Thanks,