Hi Experts.

I have one scenario in Pharma industries.

We have produces one material in 9 batches 9 process order created against material. As per catalyst cycle 1 component consumption as per below.

Batch 1 13.5 KG

Batch 2 2.5 kg (plus Batch 1 material re use 531 done in batch 1)

Batch 3 2.5 kg (plus Batch 2 material re use 531 done in batch 2)

Batch 4 2.5 kg (plus Batch 3 material re use 531 done in batch 3)

Batch 5 2.5 kg (plus Batch 4 material re use 531 done in batch 4)

Batch 6 2.5 kg (plus Batch 5 material re use 531 done in batch 5)

Batch 7 2.5 kg (plus Batch 6 material re use 531 done in batch 6)

Batch 8 1.5 kg (plus Batch 7 material re use 531 done in batch 7)

Batch 9 1.5 kg (plus Batch 8 material re use 531 done in batch 8)

Total 30 kg

Total 30 kg will consume against 9 batch.

We have insert average 3.5 kg in BOM

Now issue is how I can issue 13.5 kg material from store against 1st batch reservation auto crated in process order (it will show 3.5 kg as per BOM)