Hi Experts.
I have one scenario in Pharma industries.
We have produces one material in 9 batches 9 process order created against material. As per catalyst cycle 1 component consumption as per below.
Batch 1 13.5 KG
Batch 2 2.5 kg (plus Batch 1 material re use 531 done in batch 1)
Batch 3 2.5 kg (plus Batch 2 material re use 531 done in batch 2)
Batch 4 2.5 kg (plus Batch 3 material re use 531 done in batch 3)
Batch 5 2.5 kg (plus Batch 4 material re use 531 done in batch 4)
Batch 6 2.5 kg (plus Batch 5 material re use 531 done in batch 5)
Batch 7 2.5 kg (plus Batch 6 material re use 531 done in batch 6)
Batch 8 1.5 kg (plus Batch 7 material re use 531 done in batch 7)
Batch 9 1.5 kg (plus Batch 8 material re use 531 done in batch 8)
Total 30 kg
Total 30 kg will consume against 9 batch.
We have insert average 3.5 kg in BOM
Now issue is how I can issue 13.5 kg material from store against 1st batch reservation auto crated in process order (it will show 3.5 kg as per BOM)