May 26, 2020 at 01:10 AM

Can you create Costing BOM and Production BOM with the same BOM number?

236 Views Last edit May 26, 2020 at 01:12 AM 2 rev

I want to ask if it is possible to create a Costing BOM and Production BOM for the same material with the same BOM number?
The contents of each BOM will be slightly different. Additionally, BOM usage for production BOM is 1 and costing BOM is 6 so that should be able to differentiate the BOM contents.

When creating a BOM and saving it, the BOM number is automatically decided by the system. But I want to know if it is possible to create costing bom and production bom under the same number?